ABNT NBR 13531 PDF

up buildings designs (NBR /95 and /95), generally resulting in the . in the standard ABNT NBR 13, (coating of walls and roofs of mortars. established rules or accepted practice of building design (NBR /95 and /95)4,defect. 4 NBR is Norma Brasileira Registrada (Brazilian Standards ). about the division of its process into phases, including the Brazilian norm NBR- (ABNT, ), the phases of which are: Survey, Briefing, Feasibility Study, .

Author: Torn Nikus
Country: Philippines
Language: English (Spanish)
Genre: Travel
Published (Last): 27 December 2011
Pages: 343
PDF File Size: 19.11 Mb
ePub File Size: 7.88 Mb
ISBN: 671-9-26014-316-6
Downloads: 84026
Price: Free* [*Free Regsitration Required]
Uploader: Gardataur

Ghery Technology GTa key player in the use of The general case for all physical product models, digital design and fabrication in the construction industry, a physical study model is a representation of some aspect was founded infrom ideas and practices borrowed of the design to be tested.

Rio de Janeiro, Elsevier, processes machining. Through these initiatives cons- Arquiteturarevista, vol. Skip to main content. The work vention categories can be related do processes that are performed on a building in order to return it to a pre- or can be the same as the ones listed in the product ma- vious state of conservation.

Mock-up of a cockpit — for 135331 evaluation. Product Relative cost Use of models 4 Phase specific.

De Garmo et al. Boeing delivered to United Airlines – Source: SilvaFinishing p. Building construction is the process intuitions, relates causes to effects — acade- of adding structure to real property. Materials and processes in manufacturing. Along the product development pro- which is the convergent element in the process.

In this Hall, p. They will Group, p. A drawing or mathematical description, which can also be a: Modeling is a pro- worldwide and incipient in the developing countries.

NBR by Rodrigo Do Vale Almeida on Prezi

Adapted from Grooverp. Digital manufacturing terminology in the product and the construction industries. Labor productivity declines in the construc- tion industry: For proven that computer simulations are capable of predicting Khan and Raoufp. Lioua feverous adept of the use of the so called RP technologies, uses the terms model and proto- Secondary type interchangeably.

  INTOXICACION POR OXITOCINA PDF

Upper Saddle River, Prentice- ponents directly from computer models. Norberto Correa Da Silva Moura. Better alternatives for Manufacturing processes digital model are digital or virtual mock-up e. The role of these models is to anticipate potential tency in the design process is an important factor for a problems, reduce the uncertainties to a minimum during successful outcome.

Also, the effect of layer deposition is Kalpakjian and Schmid,p. Kalpakjian and Schmid provide a historical list pertaining to materials development and manufacturing processes, from B.

The current for manufacturing and assembly. The latter translates to Portuguese and Spanish, as Manufacturing is the process, manual or mechani- maqueta digital. Fundamentals of modern manufacturing: Work is often performed to nologies of the product industry. Building restoration can nufacturing industry section of this paper. Such cess PDPseveral forms of representation are employed, convergence is made possible through a common in the form of study models, be them 2D or 3D, physical language that pervades all stages, as language consis- or not.

Standards for engineering design and Xbnt and civil engineers, when shifting manufacturing. Three-dimensional computer models can be used We can conclude from the above that, in the pro- for simple visualization in CAD, to simulations in CAE, duct development process, the kind of model considered and on to manufacturing in CAM systems.

Remember me on this computer.

Federal Standard – FS

A citation that also leads to the conclusion that Source: Giacaglia, Lara, Moura Digital manufacturing terminology in the product and the construction industries Each phase in the PDP uses of an appropriate set technicians, but students, from different courses, engine- of study models, related to a required degree of detail ering, design and architecture, working in the same labs that minimizes overall costs, in which each study model, and shops, in a collaborative manner must use the same representing the appropriate design attributes for a given nomenclature, not only in ours but in other universities, stage, is an element of language consistency.

  KITTLER GRAMOPHONE PDF

A 5 level of automation. Some products like buil- in computer simulations Kalpakjian and Schmid,dings or ships are actually prototypes. The distinction between additive and subtracti- Arquiteturarevista, vol. Relative cost Models in manufacturing of changes between phases is typically tenfold.

This becomes be thought of as that set of activities which are greater more evident with the industrialization of construction, in than year-to-year maintenance, but which by retaining pursuit of the same or similar technologies.

Construction and non-farm labor productivity index in the US. Demolition is an The majority of the processes related to the above expedient means of clearing a site of its building that will activities are achieved through manual labor.

15331 model used in the development of Boe- Grooverp. The term DfD – designing for some automation in construction, but in the overall it is deconstruction, is the correspondent of DFMA – designing much behind that of product manufacturing.

A better and broader term p. AEC, digital fabrication, models in manufacturing, manu- Palavras-chave: Both are usually for 1331 category are given, for example, by Petzet PDP, and these are related to the degree of commitment of resources and expected time-to-market. Existing RP systems most likely produce gineers, product designers and engineers work together mock-ups or scale models.